Papers
Generalization of the results from investigations on perfecting the design of journal bearings for large steam turbines for nuclear power stations
A. S. Lisyanskii,N. P. Egorov,M. I. Shklyarov,N. S. Lebed’ko,A. F. Spiridonov,R. K. Koval’skii,A. E. Yazykov +6 more
TL;DR: In this paper, the main results obtained from investigations on perfecting the design of experimental bushes 600 mm in diameter are presented. And the effect of the structural elements and geometrical parameters on the characteristics of bearings is analyzed.
5
•Journal Article
The main results of retrofitting the K-200-130 steam turbine and adjusting its vibrations at the Mátra thermal power station (Hungary)
A. S. Lisyanskii,N. P. Egorov,A. V. Nikol'skii,N. S. Lebed’ko,M. I. Shklyarov,A. F. Spiridonov +5 more
TL;DR: The main results of retrofitting the K-200-130/1 steam turbine at the Matra thermal power station are described in this paper, where the results of the dynamic tests, the deformation measurements, the retrofitting of the bearings and seals, the alignment, and the vibration adjustment of the rotors are presented.
2
Development of shaft lines with a small number of bearings for high power steam turbines
A. S. Lisyanskii,M. I. Shklyarov,N. S. Lebed’ko,N. P. Egorov,A. F. Spiridonov,E. M. Sukhorukov,A. I. Kumenko +6 more
TL;DR: In this article, a comparative analysis of designs for high power steam turbines with a small number of bearings and those with multiple bearings is made and the eigenmodes and forced oscillations of a shaft line are calculated.
1
The Basic Results of Alignment and Summary of Operations of the Main K-1000-60/3000 Turbine Unit with a Small Number of Bearings at the Bushehr Nuclear Power Plant
TL;DR: In this paper, the results of vibration alignment and the first years of use of the prototype K-1000-60/3000-3 turbine unit of the Bushehr NPP in 2011-2016 are examined.