1. What is the main idea behind the extension from deterministic forecasting to probabilistic?
The extension from deterministic forecasting to probabilistic allows more efficient management of the transmission system through improved load dispatch and better scheduling of spinning reserve.
read more
2. What is the reason for the larger bandwidths for CKD?
The authors would suggest larger bandwidths for CKD is intuitive becauseexponential decay leads to less historical information being captured, and so there is a need for a greater degree of kernel smoothing, and this is manifested in larger values for the bandwidths.
read more
3. What is the power curve used in the work of Taylor et al. (2009)?
An idealized deterministic curve, of this form, is used in the work of Taylor et al. (2009), Hering and Genton (2010) and Gneiting (2011a).
read more
4. How many realizations of wind speed were generated?
(2) Monte Carlo simulation of the bivariate VARMA-GARCH model of Section 3is performed to generate 1,000 realizations of wind speed for a selected lead time.
read more





