Open AccessJournal Article
Energy efficiency and delay analysis in wireless sensor network
1
TL;DR: Using theoretical analysis and simulation confirmation, this paper could make a conclusion that packet payload length, bit error rate, node number,ention window size and the maximum retransmission times allowed all had influences on packet drop rate, and then affected network performance.
read more
Abstract: In order to build the mathematical relationship between network parameters and performances,this paper started from the three basic elements of communication and took account the backoff mechanism in sending period,bit error rate in transmission period and collision rate in receiving period. Using theoretical analysis and simulation confirmation,it could make a conclusion that packet payload length,bit error rate,node number,contention window size and the maximum retransmission times allowed all had influences on packet drop rate,and then affected network performance.
read more
Chat with Paper
AI Agents for this Paper
Find similar papers on Google Scholar, PubMed and Arxiv
Write a critical review of this paper
Analyze citations of this paper to find unaddressed research gaps
Citations
Clustering energy-efficient transmission protocol for Wireless Sensor Networks based on ant colony path optimization
Huahongzi Chen,Ze Lv,Ruichun Tang,Ye Tao +3 more
- 21 Jul 2017
TL;DR: A clustering energy-efficient transmission protocol for wireless sensor networks based on ant colony path optimization (CEETP-ACPO) is proposed and simulation results show the effectiveness of the proposed protocol.
14