Book Chapter10.1002/9781118838167.CH6
Earned Value Analysis
Andrew Baldwin,David Bordoli +1 more
- 14 Apr 2014
- pp 158-170
5
About: The article was published on 14 Apr 2014. The article focuses on the topics: Earned value management.
read more
Chat with Paper
AI Agents for this Paper
Find similar papers on Google Scholar, PubMed and Arxiv
Write a critical review of this paper
Analyze citations of this paper to find unaddressed research gaps
Citations
Driving Continuous Improvement by Developing and Leveraging Lean Key Performance Indicators
Fernando España,Cynthia C.Y. Tsao,Mark Hauser +2 more
- 01 Jan 2012
TL;DR: To advance to the next stage of improving project performance, it is proposed that the AEC industry begin adopting an available set of lean metrics and analytics that are more effective in evaluating system performance.
•Dissertation
Participants’ power asymmetry in public infrastructure projects
Hamzeh Zarei
- 01 Jan 2017
TL;DR: In this article, the authors present a Table of Table of Contents of a Declaration and a Preface for acknowledgment of the work. And acknowledgments of the Declaration.
11
•Journal Article
EVMS for Cost Management of Residential Projects
TL;DR: In this article, the authors describe a qualitative study that discusses the barriers involved in implementing EVA (Earned Value Analysis) for project monitoring in Indian construction SMEs and find that the problem in implementing the EVA is less technical and more a management working problem.
3
Iron ore tailings in the production of cement tiles: a value analysis on building sustainability
Wanna Carvalho Fontes,Giovanni Gonçalves Fontes,Ellen Cristine Pinto da Costa,Júlia Castro Mendes,Guilherme Jorge Brigolini Silva,Ricardo André Fiorotti Peixoto +5 more
TL;DR: O presente trabalho abrange o desenvolvimento de ladrilho hidraulico sustentavel (LHS) produzido com rejeitos de barragem de minerio de ferro (RBMF).
Penerapan metode earned value analysis menggunakan software primavera project planner pada pembangunan instalasi pengolahan air limbah
Nadila Agnessia,Drajat Indrajaya +1 more
TL;DR: The project experienced delays due to various factors. Earned Value Analysis (EVA) is used to estimate the time and cost of the project. The estimated cost is greater than the project planning cost if the trend of project implementation continues.
References
Driving Continuous Improvement by Developing and Leveraging Lean Key Performance Indicators
Fernando España,Cynthia C.Y. Tsao,Mark Hauser +2 more
- 01 Jan 2012
TL;DR: To advance to the next stage of improving project performance, it is proposed that the AEC industry begin adopting an available set of lean metrics and analytics that are more effective in evaluating system performance.
•Dissertation
Participants’ power asymmetry in public infrastructure projects
Hamzeh Zarei
- 01 Jan 2017
TL;DR: In this article, the authors present a Table of Table of Contents of a Declaration and a Preface for acknowledgment of the work. And acknowledgments of the Declaration.
11
•Journal Article
EVMS for Cost Management of Residential Projects
TL;DR: In this article, the authors describe a qualitative study that discusses the barriers involved in implementing EVA (Earned Value Analysis) for project monitoring in Indian construction SMEs and find that the problem in implementing the EVA is less technical and more a management working problem.
3
Iron ore tailings in the production of cement tiles: a value analysis on building sustainability
Wanna Carvalho Fontes,Giovanni Gonçalves Fontes,Ellen Cristine Pinto da Costa,Júlia Castro Mendes,Guilherme Jorge Brigolini Silva,Ricardo André Fiorotti Peixoto +5 more
TL;DR: O presente trabalho abrange o desenvolvimento de ladrilho hidraulico sustentavel (LHS) produzido com rejeitos de barragem de minerio de ferro (RBMF).