A data-driven method for pipeline scheduling optimization
28
TL;DR: A two-stage mathematical model based on the event sequence, whose model scale greatly decreases after stripping the terms of event sequence is introduced, and a data-driven method is presented to learn a large number of existing scheduling data and accelerate the calculation of first-stage model.
read more
Abstract: The detailed scheduling of distributing products through pipelines is one of the most essential tasks in the management of multiproduct pipelines. The current methods of scheduling optimization are still limited by the dilemma between optimality and efficiency, especially when dealing with real-world scheduling issues. This paper introduces a two-stage mathematical model based on the event sequence, whose model scale greatly decreases after stripping the terms of event sequence. Then, a data-driven method is presented to learn a large number of existing scheduling data and accelerate the calculation of first-stage model. The method is decomposed into three parts: (1) take cold start to generate a good deal of basic training data; (2) train the neural network for the fast solution of first-stage model; (3) take real-world cases to improve the self-learning of neural network. A multiproduct pipeline in China is taken as the example to prove the practicability and superiority of the proposed method. The experimental results show that the proposed method could decrease the computation time from about several hours to several minutes.
read more
Chat with Paper
AI Agents for this Paper
Find similar papers on Google Scholar, PubMed and Arxiv
Write a critical review of this paper
Analyze citations of this paper to find unaddressed research gaps
Citations
A point prediction method based automatic machine learning for day-ahead power output of multi-region photovoltaic plants
TL;DR: A combined method for day-ahead SPG prediction of multi-region photovoltaic (PV) plants and the SPG physical model is taken into account, indicating that the combined method provides acceptable accuracy and outperforms several baselines and other methods used for comparison.
57
Carbon footprint of oil products pipeline transportation.
TL;DR: A detailed Life Cycle Assessment model is established to analyze carbon emissions of oil products pipeline system from construction to disposal as well as its impact on soil environment and relevant recommendations are put forward based on the results to help reduce emissions from oil product pipe transportation.
46
A review of multiproduct pipeline scheduling: From bibliometric analysis to research framework and future research directions
Zhengbing Li,Yongtu Liang,Qi Liao,Bo Zhang,Haoran Zhang +4 more
- 20 Aug 2021
TL;DR: The aim of the paper is to provide a comprehensive understanding of multiproduct pipeline scheduling as well as some directions and inspiration for the future research.
36
Urban carbon accounting: An overview
TL;DR: In this paper , the authors examined 662 articles published over the past three decades to identify major thematic areas of research on carbon accounting in cities and determine how they are linked.
34
Deeppipe: a customized generative model for estimations of liquid pipeline leakage parameters
Jianqin Zheng,Yongtu Liang,Ning Xu,Bohong Wang,Taicheng Zheng,Zhengbing Li,Qi Liao,Haoran Zhang +7 more
TL;DR: This work proposes a generative adversarial networks (GANs) framework for leak detection and localization from the perspective of data science instead of physical meaning and it is confirmed that the proposed method is better than the improved PSO and ANN.
30
References
Experimental investigation of heuristics for resource-constrained project scheduling: An update
Rainer Kolisch,Sönke Hartmann +1 more
TL;DR: In this paper, a survey of heuristics for resource-constrained project scheduling problem (RCPSP) is presented, which provides an update of our survey which was published in 2000.
799
A branch and bound algorithm for scheduling trains in a railway network
TL;DR: A branch and bound algorithm which includes implication rules enabling to speed up the computation of a train scheduling problem faced by railway infrastructure managers during real-time traffic control is developed.
663
Experimental Investigation of Heuristics for Resource-Constrained Project Scheduling: An Update
Rainer Kolisch,Sönke Hartmann +1 more
- 01 Jan 2004
TL;DR: In this paper, a survey of heuristics for resource-constrained project scheduling problem (RCPSP) is presented, which provides an update of our survey which was published in 2000.
661
Application of the Branch and Bound Technique to Some Flow-Shop Scheduling Problems
Edward Ignall,Linus Schrage +1 more
TL;DR: In this paper, the branch-and-bound technique was applied to two flow-shop scheduling problems, i.e., 2-machine and 3-machine, with the objective of minimizing the makespan.
626
Scope for industrial applications of production scheduling models and solution methods
Iiro Harjunkoski,Christos T. Maravelias,Peter Bongers,Pedro M. Castro,Sebastian Engell,Ignacio E. Grossmann,John N. Hooker,Carlos A. Méndez,Guido Sand,John M. Wassick +9 more
TL;DR: The aim of the paper is to focus on the industrial aspects of scheduling and discuss the main characteristics, including strengths and weaknesses of the presented approaches, as well as some lessons learned from industry.
511