Xiaochu Wang
Guangdong University of Technology
12 Papers
8 Citations
Xiaochu Wang is an academic researcher from Guangdong University of Technology. The author has contributed to research in topics: Engineering & China. The author has an hindex of 2, co-authored 6 publications.
Chat about Author
Papers
2D discrete element simulation on the marine natural gas hydrate reservoir stimulation by splitting grouting
Xiaochu Wang,Youhong Sun,Wei Guo,Shengli Li,Hangkai Chen,Saiyu Peng,Shuhui Jiang +6 more
- 01 Jan 2023
TL;DR: In this paper , a 2D discrete element method was used to establish a fine-scale model for NGH reservoir and numerical tests were conducted on split grouting, where the pattern, direction and range of the grouting expansion were analyzed under different conditions of hydrate saturation, injection pressure, grout viscosity, injection well size, in-situ stress, and the number of injection wells.
11
Fuzzy PID control for impact force of high speed wire bonding process
Jian Gao,Dai Guanhao,Jiang Yongjun,Xiaochu Wang,Yun Chen,Hui Tang,Yunbo He +6 more
- 01 Aug 2016
TL;DR: In this article, an improved fuzzy PID algorithm was proposed to control the overshot and fluctuation of the impact force in wire-bonding machines, which can reduce the vibration energy of the Z-axis motion and reduce the force fluctuation.
3
Patent
Cylinder cam mechanism assembly for sticking machine lead frame feeding
Ketian Li,Wu Xiaohong,Xiaochu Wang +2 more
- 22 Jun 2005
TL;DR: In this article, a spatial cam mechanism assembly for feeding lead frame of chip adhering machine, which contains two-crossed spatial inclined plane for providing the driving force needed in XY plane and Z direction, the spatial cam rotated in one direction driven by step motor.
2
Research on the Management of China's Rural Infrastructure Projects under the Background of Rural Revitalization Strategy
Xiaochu Wang,Biyou Jiang +1 more
TL;DR: Wang et al. as mentioned in this paper investigated the legal system of project management, project management is not standardized, project cost, the construction schedule and the project quality are not coordinated, and bidding is not rigorous enough.
1
Design of Lead-Frame Driving Mechanical Structure of Die Bonder
Ketian Li,Xin Chen,Wu Xiaohong,Xiaochu Wang,Jian Gao +4 more
- 01 Aug 2006
TL;DR: In this paper, the 3D cam was controlled to fulfill scheduled moving rule by the curve of the slope contour in the XY plane and Z directions, by which the branched wrist rack could be forced by the two slopes and Z direction.
1