E.A. Bjorklund
Los Alamos National Laboratory
8 Papers
17 Citations
E.A. Bjorklund is an academic researcher from Los Alamos National Laboratory. The author has contributed to research in topics: Upgrade & Spallation Neutron Source. The author has an hindex of 3, co-authored 8 publications.
Chat about Author
Papers
Completion of the LANSCE proton storage ring control system upgrade-a successful integration of EPICS into a running control system
S.C. Schaller,E.A. Bjorklund,N.T. Callaway,G.P. Carr,J.A. Faucett,M.A. Oothoudt,D.J. Ostrem +6 more
- 12 May 1997
TL;DR: The Los Alamos Neutron Scattering Center (LANSCE) proton storage ring (PSR) control system upgrade is complete as discussed by the authors, which includes conversion of several application programs to Experimental Physics and Industrial Control System (EPICS) based operator interfaces, moving some data acquisition hardware to EPICS Input-Output Controllers (IOCs), and the implementation of new gateway software to complete the overall control system interoperability.
6
•Posted Content
The SNS Run Permit System
Coles Sibley,E.A. Bjorklund +1 more
TL;DR: The primary functionality of the Run Permit System and the interface between the Run permit System, the Machine Protection System, and the timing system are described.
3
The LANSCE RICE control system upgrade
M.A. Oothoudt,S.C. Schaller,E.A. Bjorklund,M. Burns,G.P. Carr,J.A. Faucett,D. Hayden,M. Lusk,R. Merl,J. Potter,J. Reynolds,D. Romero,F. Shelley +12 more
- 12 May 2003
TL;DR: The LANSCE (Los Alamos Neutron Science Center) control system upgrade program continues with the impending replacement of the RICE (Remote Instrumentation and Control Equipment) subsystem with Programmable Logic Controllers (PLCs).
Completion of the LANSCE Proton Storage Ring Control System Upgrade -- A Successful Integration of EPICS Into a Running Control System
S.C. Schaller,E.A. Bjorklund,G.P. Carr,J.A. Faucett,M.A. Oothoudt +4 more
- 01 May 1997
TL;DR: The Los Alamos Neutron Scattering Center (LANSCE) proton storage ring (PSR) control system upgrade is complete and many operator interface (OPI) screens, written by LANSCE operators, have been incorporated in the new system.
3
The status of the LAMPF control system upgrade
S.K. Brown,S.C. Schaller,E.A. Bjorklund,G.P. Carr,Roger A. Cole,Jamii K. Corley,James F. Harrison,Thomas Marks,Patricia A. Rose,Georgia A. Pedicini,David E. Schultz +10 more
TL;DR: Several optimization techniques which have been used to improve system-wide performance and a limited VAX/VMS operating system environment which has been made available to the accelerator operators are described.