Bin Li
7 Papers
29 Citations
Bin Li is an academic researcher. The author has contributed to research in topics: Casing & Cementation process. The author has an hindex of 3, co-authored 6 publications.
Chat about Author
Papers
The nine-year changes of the incidence and characteristics of metabolic syndrome in China: longitudinal comparisons of the two cross-sectional surveys in a newly formed urban community
Boren Jiang,Bin Li,Yongbin Wang,Bing Han,Ningjian Wang,Qin Li,Weihong Yang,Guolan Huang,Jinhua Wang,Yi Chen,Yingchao Chen,Chunfang Zhu,Dongping Lin,Yingli Lu +13 more
TL;DR: The dramatically changed environments have extensive influence on metabolic parameters of local residents and more targeted measures need to be taken to meet the serious challenges of metabolic diseases.
Analysis of casing stress during multistage fracturing of shale gas horizontal wells considering thermo‐hydro‐mechanical coupling
TL;DR: In this paper , the effects of temperature, casing thickness, non-uniform in situ stress, mechanical properties of cement sheath, and treating pressure on the stress and deformation of CCF were investigated.
4
Patent
A casing pipe pressure control well cementation process
Guo Jianhua,Li Jie,Hu Xihui,Ma Yong,Cao Quan,Liu Bo,Bin Li,Xu Bingqing,Fu Zhi,Shen Xinyu,Xia Lianbin,Yang Huajian,Ren Rui,Zhou Daisheng +13 more
- 07 May 2019
TL;DR: In this article, a casing pipe pressure control well cementation process is described, which sequentially comprises a casing running stage, a cement injection and displacement stage and a bump pressure and setting waiting stage.
2
Challenges and Methods to Improve Well Cementing Quality for 177.8 mm Liner in Gaoshiti-Moxi Area
TL;DR: In this paper, a large temperature difference channeling cement slurry system, effective anti-pollution spacer and high-pressure packer type liner hanger were developed and applied for field tests in the early stage of development.
Patent
A drilling liner pressure control well cementation process
Guo Jianhua,Li Jie,Hu Xihui,Ma Yong,Cao Quan,Liu Bo,Bin Li,Xu Bingqing,Fu Zhi,Shen Xinyu,Xia Lianbin,Yang Huajian,Ren Rui,Zhou Daisheng +13 more
- 07 May 2019
TL;DR: In this article, a drilling liner pressure control well cementation process sequentially comprises a casing running stage, the drilling liner hanger seating and hanging stage, a cementing and replacing stage, bump pressure and drill string pulling-out stage, and a setting waiting stage.
2